Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

RoadWorks

New Drainage Improvements Invernettie Roundabout

Drainage Improvements on the A90 south of Invernettie roundabout in Peterhead

Start Date:11 November 2024
End Date:29 November 2024
Estimated Duration:19 Days
Time:from 9.30am to 3.30pm
Location:south of Invernettie Roundabout, Peterhead
Traffic Management:Temporary traffic lights
Description:Will see drainage works that will include a carrier pipe replacement and footway repairs to reduce flooding and improve overall safety

Source: https://netrunkroads.scot

Peterhead_line

Peterhead.Live on

Peterhead_line

A90 Rathen Road closure

Northbound Structural Repairs A90 Rathen overnight Road closure

Northbound Structural Repairs A90 Rathen overnight Road closure
«©OpenStreetMap»
Start Date:5 November 2024, 7:30pm
End Date:
15 November 2024, 6:30am
Estimated Duration:10 Working Day (s)
Location:A90 between Lonmay and Rathen
Traffic Management:Road closure
Description:Structural Repairs
Diversion:Exit A90 by turning left onto the B952 at Cortes Junction. Continue to Denhead Junction and turn right onto the B9093.At Strichen turn right onto the A981continue to Memsie turning right onto the B9032 and re join the A90 at the Memsie Junction.
A90 Lonmay Road closure and TTLS
«©OpenStreetMap»

Source: www.traffic.gov.scot

Peterhead_line

Peterhead.Live on

Peterhead_line

A90 North of Toll of Birness

Roadworks on A90 North of Toll of Birness with Portable Traffic Lights

A90 North of Toll of Birness
«©OpenStreetMap»
Start Date:8 January 2024, 8:00am
End Date:10 January 2024, 6:00pm
Estimated Duration:3 Days
Location:A90 (Junction Leask to Junction Hatton) to A90 (Junction A952 Toll of Birness to Junction Leask), Southbound
Traffic Management:Temporary traffic lights
Description:Utility Works
A90 North of Toll of Birness
«©OpenStreetMap»

Source: www.traffic.gov.scot

Peterhead_line

Peterhead.Live on

Peterhead_line

New – Roadworks Invernettie Roundabout 12 Days

Roadworks Invernettie Roundabout to allow for the upgrading and replacement of existing High Voltage cables in the vicinity

Roadworks Invernettie Roundabout
«©OpenStreetMap» | Roadworks Invernettie Roundabout
Start Date:29 January 2024
End Date:10 February 2024
Estimated Duration:12 Days
Location:Invernettie Roundabout, Peterhead
Traffic Management:Temporary traffic lights and speed restrictions.
Description:Upgrading and replacement of existing High Voltage cables
TTLs to be manually controlled to optimize traffic flow from roundabout.

In preparation for the construction of the new converter station, enabling works will include:

  • Two new permanent access roads with new junctions on the U66, along with a temporary road through the site for construction traffic. 
  • A site car park and erection of temporary site offices for use during construction. 
  • Construction of a new cable sealing end compound, and removal of two existing 132kV towers including an existing cable sealing end compound on the existing overhead line that crosses the site.
  • Ground investigation works.
  • Undergrounding of the existing 11kV overhead line within the converter station land boundary. A new 11kV connection will be installed into the site, running parallel with the A90. This will require periodical temporary traffic lights on the A90 from the U66 junction to the Invernettie roundabout, until March 2024.

More details >>>

Roadworks Invernettie Roundabout
«©OpenStreetMap» | Roadworks Invernettie Roundabout

Source: https://www.ssen.co.uk/

Peterhead_line

Peterhead.Live on

Peterhead_line
error: ALERT !!