Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

Ugie Road

New – Road Surface Patching Works from 29.05

Rolling Programme Road surface patching works in Peterhead and surrounding area for 88 Days to be carried out by Aberdeenshire Council

Road Surface Patching Works
Road Surface Patching Works

88 Days Commencing from 29 May 2023.

This is a rolling programme of work at a number of sites. It is not possible to provide exact date for each site.

Peterhead – roads closure

  • A950, Longside road (whole section).
  • C48B, Blackhouse Terrace
  • C48B, Ugie Road & Ugie Street
  • Dickie Drive
  • Dingwall Drive
  • Skelton Street

Near Peterhead – roads closure

  • A975, South of Chapelhill to Kiplaw Croft, Cruden Bay
  • A948, Auchnagatt to Burngrains
  • A948, Auchnagatt to Burngrains
  • B9033, A90 to St. Combs
  • C39B, Station Terrace, Longside to C5B
  • C64B, Peterhead A90 to U66B
  • C64B, Peterhead A90 to U66B
  • Main Street & High Street, New Deer
  • Knock View, Stuartfield
  • Mitchell Place, Stuartfield
  • Mill Lane & Crown Cottages, Stuartfield

40mph & 20mph speed limit + 10mph for convoy

  • A950, Berryhill to Howe of Buchan
  • A950, Berryhill to Howe of Buchan
  • A952, C101B to Ardallie
  • A952, C101B to Ardallie

All images belong to Aberdeenshire Council

Potholes should be reported at https://online.aberdeenshire.gov.uk/apps/roadconditions/

Peterhead_line

Peterhead.Live on

Peterhead_line