A90 Rathen Road closure

Northbound Structural Repairs A90 Rathen overnight Road closure

Northbound Structural Repairs A90 Rathen overnight Road closure
«©OpenStreetMap»
Start Date:5 November 2024, 7:30pm
End Date:
15 November 2024, 6:30am
Estimated Duration:10 Working Day (s)
Location:A90 between Lonmay and Rathen
Traffic Management:Road closure
Description:Structural Repairs
Diversion:Exit A90 by turning left onto the B952 at Cortes Junction. Continue to Denhead Junction and turn right onto the B9093.At Strichen turn right onto the A981continue to Memsie turning right onto the B9032 and re join the A90 at the Memsie Junction.
A90 Lonmay Road closure and TTLS
«©OpenStreetMap»

Source: www.traffic.gov.scot

Peterhead_line

Peterhead.Live on

Peterhead_line

New – Portable Traffic Lights North of Peterhead A90

Roadworks with Portable traffic Lights North of Peterhead between Fraserburgh on A90

Portable traffic Lights South of Peterhead
«©OpenStreetMap»

8th November

Start Date:8 November, 8:00am
End Date:9 November, 5:00pm
Estimated Duration:2 Days
Location:A90 Rathen – Temporary traffic signals
Traffic Management:Portable Traffic Lights (TTLS)
Description:Carriageway Patching

10th November

Start Date:10 November, 8:00am
End Date:10 November, 5:00pm
Estimated Duration:1 Day
Location:A90 Cortes – Temporary traffic signals
Traffic Management:Portable Traffic Lights (TTLS)
Description:Gully/ironwork repairs

13th November

Start Date:13 November, 7:30am
End Date:22 December, 6:30pm
Estimated Duration:40 Days
Location:A90 Lonmay to Rathen Drainage works – TTL’s
Traffic Management:Portable Traffic Lights (TTLS)
Description:Filter Drain

20th November

Start Date:20 November, 7:00am
End Date:27 November, 5:00pm
Estimated Duration:8 Days
Location:A90 Crimond – TTL’s
Traffic Management:Portable Traffic Lights (TTLS)
Description:Third Party Works
Portable traffic Lights South of Peterhead
Portable Traffic Lights North of Peterhead A90

Source: www.traffic.gov.scot

Peterhead_line

Peterhead.Live on

Peterhead_line

New – A90 Lonmay Temporary Traffic Lights

Resurfacing on A90 Lonmay Temporary Traffic Lights for 15 Days

A90 Lonmay Stop/Go
«©OpenStreetMap»
Start Date:1 September 2023, 7:30pm
End Date:15 September 2023, 6:00am
Estimated Duration:15 Days
Location:Northbound, A90 (Junction Starnafin to Junction B9033 St. Combs) to A90 (Junction B9033 St. Combs to Start of one way Wb)
Traffic Management:Temporary traffic lights.
Description:Resurfacing
A90 Lonmay Temporary Traffic Lights
«©OpenStreetMap»
Peterhead_line

Peterhead.Live on

Peterhead_line

New – Roadworks on A90 between Peterhead and Fraserburgh

Next week Carriageway Patching on A90 between Peterhead and Fraserburgh with Portable Traffic Lights

between Peterhead and Fraserburgh
«©OpenStreetMap»
25 May (Time / Location):start – 9:30am / A90 S/B St Fergus Gas Terminal – TTL’s / end – 3:30pm
24 May (Time / Location):start – 9:30am / A90 Bancar Hotel, Sth of Rathen – TTL’s / end – 3:30pm
23 May (Time / Location):start – 9:30am / A90 S/B prior to Cortes, Rathen – TTL’s / end – 3:30pm
22 May (Time / Location):start – 9:30am / A90 Northbound Prior to Memsie Jct, Rathen – TTL’s / end – 3:30pm
22 May (Time / Location):start – 9:30am / A90 N/B Prior to Gash Jct, Nth of Rathen – TTL’s / end – 3:30pm
22 May (Time / Location):start – 9:30am / A90 S/B Sth of Fraserburgh – TTL’s / end – 3:30pm
26 May (Time / Location):start – 9:30am / A90 S/B Fraserburgh to Ellon – TTL’s / end – 3:30pm (Traffic Management: Mobile Lane Closures. / Roadwork description works: Cyclic Maintenance)
between Peterhead and Fraserburgh ROADWORKS min
«©OpenStreetMap» | Next week Carriageway Patching on A90 between Peterhead and Fraserburgh with Portable Traffic Lights

Source: www.traffic.gov.scot

Peterhead_line

Peterhead.Live on

Peterhead_line

New – Road Surface Patching Works from 29.05

Rolling Programme Road surface patching works in Peterhead and surrounding area for 88 Days to be carried out by Aberdeenshire Council

Road Surface Patching Works
Road Surface Patching Works

88 Days Commencing from 29 May 2023.

This is a rolling programme of work at a number of sites. It is not possible to provide exact date for each site.

Peterhead – roads closure

  • A950, Longside road (whole section).
  • C48B, Blackhouse Terrace
  • C48B, Ugie Road & Ugie Street
  • Dickie Drive
  • Dingwall Drive
  • Skelton Street

Near Peterhead – roads closure

  • A975, South of Chapelhill to Kiplaw Croft, Cruden Bay
  • A948, Auchnagatt to Burngrains
  • A948, Auchnagatt to Burngrains
  • B9033, A90 to St. Combs
  • C39B, Station Terrace, Longside to C5B
  • C64B, Peterhead A90 to U66B
  • C64B, Peterhead A90 to U66B
  • Main Street & High Street, New Deer
  • Knock View, Stuartfield
  • Mitchell Place, Stuartfield
  • Mill Lane & Crown Cottages, Stuartfield

40mph & 20mph speed limit + 10mph for convoy

  • A950, Berryhill to Howe of Buchan
  • A950, Berryhill to Howe of Buchan
  • A952, C101B to Ardallie
  • A952, C101B to Ardallie

All images belong to Aberdeenshire Council