Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

Peterhead

Road closure – Catto Drive, Peterhead for 5 Days

Road closure for patching work junction Catto Drive, Peterhead

Catto Drive Peterhead
«©OpenStreetMap»
Start Date:10 July 2023
End Date:14 July 2023
Estimated Duration:5 Days
Location:Junction at Catto_Drive / Balmoor Terrace
Traffic Management:Road closure
Description:Patching works on Balmoor Terrace
Diversion:Junction closed but access remains from junction at farther end of Catto_Drive
Catto Drive
«©OpenStreetMap»
Peterhead_line

Peterhead.Live on

Peterhead_line

New – Roadworks on A90 between Peterhead and Fraserburgh

Next week Carriageway Patching on A90 between Peterhead and Fraserburgh with Portable Traffic Lights

between Peterhead and Fraserburgh
«©OpenStreetMap»
25 May (Time / Location):start – 9:30am / A90 S/B St Fergus Gas Terminal – TTL’s / end – 3:30pm
24 May (Time / Location):start – 9:30am / A90 Bancar Hotel, Sth of Rathen – TTL’s / end – 3:30pm
23 May (Time / Location):start – 9:30am / A90 S/B prior to Cortes, Rathen – TTL’s / end – 3:30pm
22 May (Time / Location):start – 9:30am / A90 Northbound Prior to Memsie Jct, Rathen – TTL’s / end – 3:30pm
22 May (Time / Location):start – 9:30am / A90 N/B Prior to Gash Jct, Nth of Rathen – TTL’s / end – 3:30pm
22 May (Time / Location):start – 9:30am / A90 S/B Sth of Fraserburgh – TTL’s / end – 3:30pm
26 May (Time / Location):start – 9:30am / A90 S/B Fraserburgh to Ellon – TTL’s / end – 3:30pm (Traffic Management: Mobile Lane Closures. / Roadwork description works: Cyclic Maintenance)
between Peterhead and Fraserburgh ROADWORKS min
«©OpenStreetMap» | Next week Carriageway Patching on A90 between Peterhead and Fraserburgh with Portable Traffic Lights

Source: www.traffic.gov.scot

Peterhead_line

Peterhead.Live on

Peterhead_line

New – Road Surface Patching Works from 29.05

Rolling Programme Road surface patching works in Peterhead and surrounding area for 88 Days to be carried out by Aberdeenshire Council

Road Surface Patching Works
Road Surface Patching Works

88 Days Commencing from 29 May 2023.

This is a rolling programme of work at a number of sites. It is not possible to provide exact date for each site.

Peterhead – roads closure

  • A950, Longside road (whole section).
  • C48B, Blackhouse Terrace
  • C48B, Ugie Road & Ugie Street
  • Dickie Drive
  • Dingwall Drive
  • Skelton Street

Near Peterhead – roads closure

  • A975, South of Chapelhill to Kiplaw Croft, Cruden Bay
  • A948, Auchnagatt to Burngrains
  • A948, Auchnagatt to Burngrains
  • B9033, A90 to St. Combs
  • C39B, Station Terrace, Longside to C5B
  • C64B, Peterhead A90 to U66B
  • C64B, Peterhead A90 to U66B
  • Main Street & High Street, New Deer
  • Knock View, Stuartfield
  • Mitchell Place, Stuartfield
  • Mill Lane & Crown Cottages, Stuartfield

40mph & 20mph speed limit + 10mph for convoy

  • A950, Berryhill to Howe of Buchan
  • A950, Berryhill to Howe of Buchan
  • A952, C101B to Ardallie
  • A952, C101B to Ardallie

All images belong to Aberdeenshire Council

Potholes should be reported at https://online.aberdeenshire.gov.uk/apps/roadconditions/

Peterhead_line

Peterhead.Live on

Peterhead_line

Peterhead – Emergency Road Closure for 21 Days

Kirk Street Peterhead Emergency Road Closure at Junction with St Peter Street

Kik Street min
«©OpenStreetMap»
Start Date:12 May 2023
End Date:01 June 2023
Location:at Junction with St Peter Street
Traffic Management:Road closure
Description:Emergency subsisdance works
Estimated Duration:21 Working Days
Diversion:via is in place via King Street, Ugie Street, Port Henry Road, Seagate, Union Street, Hanover Street, Lodge Walk, Bath Street and Charlotte Street.
Emergency Road Closure Kirk street 21 Days
«©OpenStreetMap»

Source: www.aberdeenshire.gov.uk

Peterhead_line

Peterhead.Live on

Peterhead_line

New – Inverugie Bridge Repairs 4 Days

A90 Peterhead Inverugie Bridge Joint Repairs with Portable Traffic Lights

Start Date:9 May 2023
End Date:12 May 2023
Location:A90 (A982 North Road to Junction Kirktown)
Traffic Management:Portable Traffic Lights (TTLS)
Description:Bridge Joint Repairs
Estimated Duration:4 Working Days

Source: www.traffic.gov.scot

Peterhead_line

Peterhead.Live on

Peterhead_line
error: ALERT !!