Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

A948

A90 near Toll of Birness Overnight Closure

Overnight surfacing improvements on the A90 near Toll of Birness will be carried out under overnight road closures between 7.30pm and 6.30am

A90 near Toll of Birness Overnight Closure
Start Date:28 September 2025
End Date:17 October 2025
Traffic Management:Road Closure
Duration:19 Days
Description:Surfacing improvements

Amey is undertaking overnight surfacing improvements on the A90 near Toll of Birness in Aberdeenshire between Sunday 28th September and Friday 17th October.

The project will deliver improvements to the A90 carriageway between 1.8 kilometres north of the A948 roundabout at Ellon and 200 metres beyond the Toll of Birness junction with the A952.
.
To ensure the safety of roadworkers and motorists the essential maintenance will be carried out under overnight road closures between 7.30pm and 6.30am.

There will be no overnight works on Friday or Saturday nights during the work period.

a90 near toll of birness
Image Credit to Amey

Additionally, temporary traffic lights will be in operation on Friday 3rd October between 6.30am and 3.30pm.

The following diversion routes will be in place each night during the road closures.

Vehicles travelling north on the A90 can leave the A90 at Ellon on the A948 and travel north to New Deer. At New Deer traffic continues north onto the A981 towards Strichen/Fraserburgh/New Pitsligo before reaching the A981’s junction with the A950.

Traffic can then turn right onto the A950 and head towards Mintlaw. At the Roundabout at the Square in Mintlaw traffic can take the second exit to continue on the A950 towards Longside and Peterhead before rejoining the A90 at Peterhead.

Vehicles travelling south on the A90 can join the A950 at Peterhead and follow the above route in reverse. From Peterhead there will be local access on the A90 south to the Pitlurg junction. Please be aware that there will be no access to the A952 at Toll of Birness.

The diversion route will require 22 minutes additional journey time.

Please note, all schemes are weather dependent and may be cancelled or rescheduled if weather conditions are not favourable.

A90 near Toll of Birness Overnight Closure
A90 near Toll of Birness Overnight Closure | A90 near Toll of Birness Overnight Closure
Peterhead_line

Peterhead.Live on

Peterhead_line

New – A90 Auchmacoy Roadworks

A948 At Auchmacoy Roundabout To U93b North Of Leys Of A90 Auchmacoy, Ellon

Start Date Between:19 September 2022 – 27 September 2022
Location:A90t A948 At Auchmacoy Roundabout To U93b North Of Leys Of Auchmacoy, Auchmacoy, Ellon
Promoter:Transport Scotland – NE Unit Op Company
Traffic Management:Traffic restrictions
Description:Carriageway Resurfacing
Estimated Duration:11 Working Days

Source: www.roadworksscotland.org

Peterhead_line

Plan Ahead with Peterhead.Live on

Peterhead_line

New – Part A948 in Ellon Road Closure

Part of Road A948 in Ellon Road Closure from A90 for Crane Install and Lift

Start Date 06 August
LocationAt Brewdog, A948 Ellon Northern Peripheral Road From A90 Auchmacoy Roundabout To Junction With C90b Golf Road, Ellon
Traffic Management:Road Closure
Description:Crane Install and lift
Promoter:Aberdeenshire Council

Source: www.roadworksscotland.org

Peterhead_line

Plan Ahead with Peterhead.Live on

Peterhead_line

A948 New Deer to Ellon road, north of Auchnagatt, will be closed

A948 New Deer to Ellon road, north of Auchnagatt, will be closed

Road Closure

Start Date15 November 2021
End Date29 November 2021
LocationB9030 to U114B
Description Works:Surface Dressing preparatory works
Traffic Management:Road Closure
Duration:14 Days
57 1 3чzzz min3
Peterhead_line

Plan Ahead with Peterhead.Live on Facebook or Twitter for get more actual information.